NSR Permits for Review (Current)

NSR Permits for Review - 2018 to present

ONLY AVAILABLE ON OUR DATABASE!!  PLEASE READ DIRECTIONS BELOW


Below is a list of applications for permit, draft permits, final permits, evaluations, and other documents that are in conjuction with registrations.  We have them listed alphabetically by county, company, then facility.  If you would like to view any of the documents listed, please click HERE to access our database.  When you open the database to login simply enter DEP as the user and DEP as the password. (ALL CAPS)  Once on the site, click on PERMITSAIR and you can search by any of the parameters listed.  If you know the permit number, which is is the second column below, you may enter it into the SECONDARY ID NUMBER field. 

Use the CTRL + the F keys as a shortcut for the Find command to search text on this web page.  Pressing CTRL + F will bring up a search box.  Just type in that search box and it will locate the text you are looking for on this page.  Examples would be county names, company names (full or partial) or permit numbers.
        
 County  Permit
Number
& Writer
Company  Application
Received
Last Day to
Comment
 
Documents

 

PSD Permit Applications

Berkeley   14-0026N
Pursley
Argos USA LLC;
Martinsburg 
January 24, 2018    Final Permit 
Evaluation
Application 
 Berkeley  R14-0026O
Pursley
Argos USA LLC;
Martinsburg 
January 24, 2018     Final Permit 
Evaluation
Application
Berkeley   14-0015M
   Andrews 
 Knauf Insulation Inc.;
Inwood 
November 3, 2016    September 13, 2017  Final Permit
Final Determination
Draft Permit
Preliminary Determination
Amended Tables 
PSD Modeling Report
Application
 Brooke 14-0035
Pursley
ESC Brooke County Power I, LLC;
Follansbee 
 March 14, 2016   June 11, 2018 Final Permit
Evaluation
Interim Permit Review 
Draft Permit 
Preliminary Evaluation
Application Resubmittal
Attachments
Application 
Harrison  14-0036
Pursley
 ESC HARRISON COUNTY POWER, LLC;
Clarksburg 
November 22, 2016   October 10, 2017   *Modeling Files are available upon request*
            
Final Permit
Final Determination
Draft Permit
Preliminary Determination
Interim Permit Review
Attachments
Application
 Jefferson  14-0037
Kessler  
 ROXUL USA, INC.;
 RAN Facility
November 21, 2017   April 27, 2018  Final Permit 
Final Determination
Draft Permit
Preliminary Determination
Attachment B
Interim Permit Review
Modeling Report
Revised Application
Application 
Marshall   14-0030
Pursley 
Moundsville Power, LLC, Moundsville  October 7, 2013     December Application
 
R14-0030
Final Determination
 Monongalia 14-0024G
Andrews
Longview Power, LLC;
Maidsville - Cass District
September 20, 2018   Final Permit
Evaluation
Application
 Pleasants   14-0034A
Pursley 
 Pleasants Energy, LLC;
 Waverly 
October 16, 2017   March 12, 2018 Final Permit
Final Determination
Draft Permit
Fact Sheet
Interim Permit Review
Application 
 Wetzel 14-0033
Andrews  
Dominion Transmission, Inc.;
Hastings Comp. Station  
September 17, 2015   June 8, 2018   Final Permit
Final Determination
Draft Permit 
Fact Sheet
Revised Application 
Application
Wood  14-0032
Kessler
 Appalachian Shale Cracker Enterprise LLC (ASCENT), Washington May 15, 2014    Cover
Application
Appendix A
Appendix B
Appendix C
Appendix D
Appendix E
Appendix F  
 
 

Barbour

 Barbour G10-D176
Roberts 
Wolf Run Mining LLC;
Sentinel Facility
November 20, 2017  December 20, 2017  Final Permit
Evaluation
Application
 Barbour G70-D356
Kees 
HG Energy II Appalachia, LLC;
AUD-7
October 3, 2018   Application

             

Berkeley

Berkeley  PD18-023
Rothwell
Allmine Paving, LLC;
Inwood
May 3, 2018   Determination 
Evaluation
Application  
 Berkeley 13-3283A
Legg 
Brown Cremation Services, Inc.;
Inwood
July 9, 2018 September 19, 2018 Final Permit
Evaluation
Draft Permit
Fact Sheet
Application
Berkeley  G20-C007C
Martin 
Jefferson Asphalt Products Company, Inc.;
Inwood, Plant #3
August 27, 2018   Final Permit
Evaluation
Application
Berkeley 13-2590A
Andrews 
LCS Services, Inc.;
Hedgesville
June 8, 2018  September 6, 2018 Final Permit
Evaluation
Draft Permit
Fact Sheet
Application
 Berkeley  13-3316D
Pursley 
THE PROCTER AND GAMBLE MANUFACTURING COMPANY;
Tabler Station  
November 20, 2017    Final Permit 
Evalutation 
  Application  
 Berkeley  13-3316E
Pursley 
 THE PROCTER AND GAMBLE MANUFACTURING COMPANY;
Tabler Station 
 February 28, 2018    Final Permit 
Evalutation 
  Application 
Berkeley  13-1156J
Kessler
 QG Printing II LLC;
Martinsburg
January 22, 2018     Final Permit 
Evaluation
Application 
Berkeley   13-1156K
Kessler
 QG Printing II LLC;
Martinsburg
August 30, 2018    Application
Berkeley   PD18-016
Rothwell
 U.S. General Services Administration;
Broadwater Building 
March 23, 2018     Determination 
Evaluation
Application 
 Berkeley   13-2212F 
Legg
 Valley Pet Memorial Services, Inc.;
Hedgesville
May 21, 2018   July 23, 2018 Final Permit 
Evaluation
Draft Permit
Fact Sheet
Application

 

Boone

Boone PD18-023
Rothwell
Allmine Paving, LLC;
Inwood
May 3, 2018   Determination 
Evaluation
Application  
Boone G10-D078H
Roberts 
Black Castle Mining Company, LLC;
Admiral Proc. Facility
 February 21, 2018   March 23, 2018   Final Permit
Evaluation
Application
Boone       

 

Braxton

Braxton  G35-D121A
Keatley  
EnerVest Operating, L.L.C.;
Servia Compressor  
April 25, 2018     Application
Braxton  13-1761J
Legg 
Weyerhaeuser NR Company;
Heaters
August 31, 2018   Application

 

Brooke

Brooke  PD18-001
Rothwell  
 APPALACHIA MIDSTREAM SERVICES, L.L.C.;
BUFFALO STATION 
January 9, 2018     Determination 
Evaluation 
Application 
Brooke  13-3048B
Williams  
APPALACHIA MIDSTREAM SERVICES, L.L.C.;
BUFFALO STATION 
February 7, 2018    May 14, 2018 Final Permit
Evaluation
Draft Permit
Fact Sheet
Application 
Brooke   G35-D136
Carney
APPALACHIA MIDSTREAM SERVICES, L.L.C.; Threedubs Station   May 21, 2018    Final Permit
Evaluation
Application 
Brooke   13-2410E
Legg
  Ardagh Metal Packaging USA Inc.;
Weirton
May 1, 2018     Final Permit
Evaluation
Application
 Brooke  13-3205A
Andrews
ECC Windsor, Inc.;
West Liberty
September 17, 2018   Application
Brooke  13-2930A
Pursley 
Holcin (US) Inc.;
Weirton Terminal  
November 22, 2017      Final Permit
Evaluation
Application 
Brooke  PD18-044
Andrews
Koppers Inc.;
Follansbee
 August 29, 2018   Determination
Evaluation
Application
 Brooke  13-2661C
Andrews 
 Mississippi Lime Company;
Weirton 
November 20, 2017     Final Permit
Evaluation
Application
Brooke 13-2661D
Andrews  
 Mississippi Lime Company;
Weirton
March 13, 2018     Final Permit
Evaluation
Application
Brooke   13-2661E
Andrews
 Mississippi Lime Company;
Weirton 
August 17, 2018    Application
 Brooke  13-3387
Egnor
 Sal Chemical;
Weirton 
October 17, 2017   February 12, 2018   Final Permit
Evaluation
Draft Permit
Fact Sheet
Application  
Brooke 13-0754A
Pursley 
STARVAGGI INDUSTRIES, INCORPORATED;
Weirton/Lime Handling  
 March 22, 2018     Application
Brooke G70-D344
Kees 
SWN Production Company, LLC;
State of WV DNR B
July 16, 2018   Final Permit
Evaluation
Application
Brooke G70-D302
Kees  
SWN Production Company, LLC;
Mark Owen Well Pad  
 November 28, 2017   December 28, 2017   Final Permit
Evaluation
Application
Brooke G70-D299 
Kees 
 SWN Production Company, LLC;
Mike Ryniawec Pad
November 20, 2017   December 20, 2017    Final Permit
Evaluation
Application 
Brooke G70-D299A
Kees 
SWN Production Company, LLC;
Mike Ryniawec Pad 
June 13, 2018    Final Permit
Evaluation
Application
Brooke  G70-D183A
Carney
SWN Production Company, LLC;
Mildred Mani Pad
August 2, 2018   Final Permit
Evaluation
Application
Brooke 13-3054C
Kees  
 SWN Production Company, LLC;
Sandra Parr Pad
January 11, 2018     Final Permit
Evaluation
Application 
Brooke G70-D308
Carney  
 SWN Production Company, LLC;
Thomas Parkinson Pad
January 12, 2018   February 12, 2018   Final Permit
Evaluation
Application 
Brooke G70-D100A
Keatley 
SWN Production Company, LLC;
Violet Coss BRK Pad
July 24, 2018    Application
Brooke G70-D337
Kees
 SWN Production Company, LLC;
Worthley Pad
June 1, 2018   Final Permit
Evaluation
Application
Brooke PD18-041
Rothwell 
WV Army National Guard;
Wheeling Armory
July 30, 2018   Determinaton
Evaluation
Application

 

Cabell

Cabell 133418
Martin 
CORE Industrial Group, LLC;
Milton
August 3, 2018   Application
Cabell PD18-011
Rothwell 
 CSX TRANSPORTATION;
Barboursville 
 February 28, 2018     Application
 Cabell G60-D100
Rothwell 
CSX Transporation;
Huntington
August 27, 2018   Final Permit
Evaluation
Application
Cabell 13-3420
Carney 
Keyrock Energy, LLC;
Childers Well Site
August 23, 2018    Application
 Cabell 13-3419
Williams 
Keyrock Energy, LLC;
Mohr Well
August 17, 2018   Application

 

Calhoun

   13-3377
Pursley
 West Virginia Oil Gathering, LLC;
Brookesville Station
 August 28, 2017 January 29, 2018  Final Permit
Evaluation
Draft Permit
Fact Sheet
Application 
           

 

Clay

 Clay G35-D120A
Keatley
EnerVest Operating, LLC;
Elk River Compressor
April 25, 2018   Final Permit
Evaluation
Applicaton 
           

 

Doddridge

Doddridge   13-3260C
Egnor
Antero Treatment LLC;
Antero Clearwater Facility
January 18, 2018     Final Permit
Evaluation
Applicaton
Doddridge  13-3260D
Williams 
Antero Treatment LLC;
Antero Clearwater Facility 
April 11, 2018     Final Permit
Evaluation
Applicaton 
Doddridge   13-3260E
Williams
Antero Treatment LLC;
Antero Clearwater Facility
July 13, 2018    Final Permit
Evaluation
Application
Doddridge  G70-D030B
Kees  
Antero Resources Corporation;
Clarence Wellpad  
February 26, 2018   March 29, 2018   Final Permit
Evaluation
Applicaton
Doddridge   G70-D046A
Carney 
 Antero Resources Corporation;
Diane Davis Pad 
January 29, 2018   February 28, 2018   Final Permit
Evaluation
Applicaton
Doddridge  G70-D043B
Keatley 
 Antero Resources Corporation;
Robert Williams Pad
January 29, 2018  February 28, 2018   Final Permit
Evaluation
Applicaton
 Doddridge G70-D010B
Kees  
 Antero Resources Corporation;
Swisher Wellpad
 February 26, 2018   March 29, 2018  Final Permit
Evaluation
Applicaton 
Doddridge 13-3216C
Kees  
Antero Midstream LLC;
Tamela Station  
January 29, 2018     Final Permit
Evaluation
Applicaton
Doddridge G35-D076A
Carney 
Dominion Energy Transmission, Inc.;
Collins Station
 March 1, 2018  March 30, 2018 Final Permit
Evaluation
Applicaton 
Doddridge  G35-D031C
Keatley
Dominion Energy Transmission, Inc.;
Maxwell Station 
February 12, 2018 March 14, 2018 Application
 Doddridge PD18-025
Rothwell 
Dominion Energy Transmission, Inc.; Tonkin MW Tower  May 10, 2018    Determination
Evaluation
Application 
 Doddridge 13-3150B
Legg
EQM Gathering Opco, LLC;
Saturn Station
June 14, 2018   Final Permit
Evaluation
Application
 Doddridge  13-3269B
Andrews
EQT Gathering, LLC;
Janus Station 
August 7, 2017  August 20, 2018  Final Permit
Evaluation
Draft Permit
Fact Sheet
Application 
 Doddridge 13-3226A
Kees 
 EQT Production COmpany;
Goodwin Station
July 23, 2018   Final Permit
Evaluation
Application
Doddridge  G70-D133A
Keatley
EQT Production COmpany;
OXF-45 Pad 
December 21, 2017  January 22, 2018  Final Permit
Evaluation
Applicaton 
 Doddridge  13-3047A
Kees
EQT Production Company;
OXF-121 Pad  
December 21, 2017 April 23, 2018 Final Permit 
Evaluation
            Draft Permit
Fact Sheet
Application 
Doddridge G70-D132A
Kees 
EQT Production Company;
OXF-131 Pad  
March 22, 2018  April 23, 2018   Final Permit
Evaluation
Applicaton 
 Doddridge   G70-D074A
Keatley
 EQT Production Company;
OXF-134 Pad
March 21, 2018   April 20, 2018   Final Permit
Evaluation
Applicaton 
Doddridge   13-3051A
Carney
  EQT Production Company;
OXF138
March 26, 2018    Final Permit
Evaluation
Applicaton 
 Doddridge  G70-D113A
Carney
EQT Production Company;
WEU-6 Pad 
October 11, 2018   Application
 Doddridge  G70-D077A
Keatley
Jay-Bee Oil & Gas, Inc.;
McIntyre Pad 
 May 31, 2018   Application 
Doddridge  13-2914G
Kessler
 Mark West Liberty Midstream & Resources LLC;
Sherwood
October 30, 2017   March 15, 2018 Final Permit 
Evaluation
Draft Permit
Fact Sheet
Application
 
Doddridge  13-2914H
Pursley 
 Mark West Liberty Midstream & Resources LLC;
Sherwood 
July 10, 2018    Application
Doddridge   13-2929D
Williams 
Mountaineer Midstream Co., LLC;
Midpoint Station
August 1, 2018 October 25, 2018  Draft Permit
Fact Sheet
Application

 

Fayette

Fayette  13-3266A
Legg 
Plateau Medical Center;
Oak Hill
June 15, 2018  July 17, 2018 Final Permit
Evaluation
Draft Permit
Fact Sheet
Applicaton 
Fayette R14-0017D
Pursley  
WVA Manufacturing, LLC;
Alloy  
December 13, 2017    Final Permit
Evaluation Applicaton
           

 

Gilmer

 Gilmer 13-3099A
Williams
HG Energy II Appalachia, LLC;
Normantown Station
September 17, 2018   Application
           

 

Grant

  G60-C056B
Rothwell  
Virginia Electric & Power Company;
Mt. Storm  
December 19, 2017   January 18, 2018   Final Permit
Evaluation
Applicaton 
           

 

Greenbrier

           
           

 

Hampshire

           
           

 

Hancock

Hancock  13-2334AB
Pursley 
 Ergon Corporation-West Virginia, Inc.;
Newell (Congo Plant)
 May 3, 2018  October 15, 2018  Final Permit
Evaluation
Draft Permit
Fact Sheet
Application 
Hancock  13-2737B
Martin  
 Genesis Cremation Services;
Chester 
 April 12, 2018  June 25, 2018   Final Permit
Evaluation
Draft Permit 
Fact Sheet
Application 
Hancock  PD18-032
Rothwell 
Marsh Bellofram;
Newell
June 8, 2018   Determination
Application
Hancock   13-3417
Kessler 
Marsh Bellofram;
Newell
August 1, 2018   Application

 

Hardy

Hardy  13-3393
Pursley  
Allegheny Dimension, A WV LLC;
Moorefield Plant 
December 14, 2017   September 28, 2018 Draft Permit
Fact Sheet
 Application
Supplimental Information
 Hardy  13-3388T
Legg 
ALLEGHENY WOOD PRODUCTS, INC.;
Moorefield Log Yard  
October 24, 2017      Extension 
Final Permit
Evaluation
Application
 Hardy 13-1293G
Legg  
Pilgrim's Pride Corporation;
Moorefield  
 November 16, 2017    Final Permit
Evaluation
Application 
 Hardy PD18-012
Rothwell  
 PRIMEWOOD, INC.;
Hardy County 
March 2, 2018    Determination
Evaluation
Application 

 

Harrison

Harrison G70-D319
Kees 
 Arsenal Resources LLC;
D'Annunzio Site 
February 28, 2018   March 30, 2018   Final Permit
Evaluation
Application 
Harrison G70-D298
Keatley  
 Arsenal Resources LLC;
Prit South Site 
November 16, 2017  December 18, 2017   Final Permit
Evaluation
Application 
Harrison 13-2891D
Carney
E. Marcellus Asset Company;
Jarvisville
June 29, 2018 October 29, 2018  Draft Permit
Fact Sheet
Application
Harrison G35-D135
Kees  
 GOFF CONNECTOR LLC;
Connector Station 
February 12, 2018   March 14, 2018    Final Permit
Evaluation
Application 
Harrison  G35-D135A
Kees
GOFF CONNECTOR LLC;
Connector Station 
 May 10, 2018     Final Permit
Evaluation
Application 
Harrison  13-2306F
Roberts
 Harrison County Coal Company;
Harrison County Fac. 
February 5, 2018     Application
Harrison   13-2306F
Roberts
Harrison County Coal Company;
 Harrison County Preparation Plant  
 May14, 2018   Final Permit
Evaluation
Application 
 Harrison  G70-D354
Kees
HG Energy II Appalachia, LLC;
KST-5 Well Pad
September 21, 2018   Application
Harrison 13-2968C
Keatley 
Mountaineer Midstream Company, LLC;
Zinnia Station 
March 22, 2018     Application 
Harrison   PD18-048
Rothwell
Pratt & Whitney Engine Services, Inc.;
Bridgeport
September 14, 2018   Determination
Evaluation
Application

 

Jackson

Jackson 13-1977E
Kessler 
Aluminum Recycling Services, inc.;
Millwood
September 6, 2018   Final Permit
Evaluation
Application
Jackson 13-2864C
Legg  
Armstrong World Industries, Inc.;
Millwood 
February 5, 2018     Final Permit
Evaluation
Application 
Jackson  PD18-013
Rothwell 
Columbia Gas Transmission, LLC;
Ripley 
 March 6, 2018   Determination
Evaluation
 Application 
 Jackson  PD18-047
Rothwell
Columbia Gas Transmission, LLC;
Ripley
September 14, 2018    Determination
Evaluation
Application
 Jackson  13-3401
Kessler
Hartley Oil Company, Incorporated;
Ravenswood  
 April 3, 2018   Application

 

Jefferson

Jefferson  G40-C003H
Martin 
Bardon, Inc.
Millville Quarry
September 6, 2018   Application
Jefferson 13-3202A
Legg 
Charles Town Utility Board;
Wastewater Plant
June 12, 2018 July 17, 2018  Final Permit
Evaluation
Draft Permit
Fact Sheet
Application
 Jefferson 13-0622B
Andrews 
Ox Paperboard, LLC;
Halltown
August 7, 2018   Application
Jefferson 13-3403
Legg 
PEACEFUL VALLY ANIMAL CREMATORY, LLC;
Charles Town 
May 14, 2018   August 31, 2018 Final Permit
Evaluation
 Draft Permit
Fact Sheet
Application 
 Jefferson 13-3403A
Martin
PEACEFUL VALLY ANIMAL CREMATORY, LLC;
Charles Town 
October 9, 2018    Application
 Jefferson 13-3414
Pursley 
TEMA NORH AMERICA, LLC;
Jefferson County Op
July 23, 2018 October 15, 2018  Draft Permit
Fact Sheet
 Application

Kanawha

Kanawha  PD18-015
Egnor 
 Bayer CropScience LP;
Institute 
March 21, 2018    Determination
Evaluation
 Application 
 Kanawha  13-3389
Legg
BYRD OF PRAY CREATIONS LLC;
St. Albans  
October 27, 2017  March 22, 2018   Final Permit
Evaluation
Draft Permit
Fact Sheet
Application
Kanawha  PD18-046 
Egnor
Chemours Company FC, LLC;
Belle
September 4, 2018   Determination
Evaluation
Application
Kanawha 13-2667B
Kessler 
 City of Charleston Sanitary Landfill;
Charleston
November 13, 2017  May 3, 2018  Final Permit
Evaluation
Draft Permit
Fact Sheet
Application
 
Kanawha  PD18-027
Rothwell 
Clearon Corporation;
South Charleston 
 May 16, 2018   Determination
Evaluation
Application
 Kanawha  PD18-028
Rothwell 
 Clearon Corporation;
South Charleston 
May 16, 2018   Determination
Evaluation
Application 
Kanawha  G65-C568
Rothwell
Columbia Gas Transmission, LLC;
Clendenin 
November 8, 2017  December 8, 2017  Final Permit
Evaluation
 
Application 
Kanawha  13-3294A
Keatley
Columbia Gas Transmission, LLC;
Elk River 
November 16, 2017    Final Permit
Evaluation
 
Application 
Kanawha 13-3397
Andrews 
 Columbia Gas Transmission, LLC;
Lanham
February 16, 2018  April 16, 2018  Final Permit
Evaluation
Draft Permit
Fact Sheet
Application
 
Kanawha  PD18-010
Rothwell
Core Appalachia Midstream LLC;
Kanawha Separation Plant 
February 26, 2018    Determination
Evaluation
 Application 
 Kanawha  13-0436H
Williams
Core Appalachia Midstream LLC;
Kanawha Separation Plant  
May 21, 2018    Final Permit
Evaluation
Application 
Kanawha  13-1847G
Chakrabarty
Elementis Specialties, Inc.;
Charleston
March 13, 2017 June 19, 2018  Final Permit
Evaluation
Draft Permit
Fact Sheet
Application
Kanawha  13-1975I
Roberts 
 Jacks Branch Coal Company;
Cannelton
March 28, 2017  March 19, 2018    Final Permit
Evaluation
Draft Permit
Fact Sheet
Application
 
 Kanawha 13-1975J
Roberts 
Jacks Branch Coal Company;
Cannelton 
July 13, 2018    Final Permit
Evaluation
Application
Kanawha  G60-D095A
Rothwell 
Mark West Hydrocarbon, L.L.C.;
Cobb Dewpoint Control Plant
July 10, 2018   Application
Kanawha  13-3425
Legg 
Mid-Atlantic Technology, Research & Innovation Center, Inc.;
Building 771
October 12, 2018   Application
Kanawha  13-2863B
Kessler
Nytis Exploration Company LLC;
Staten Run Compressor Station 
April 11, 2018   June 26, 2018 Final Permit
Evaluation
Draft Permit
Fact Sheet
Revised Application

Application  
 Kanawha 13-2093E
Kessler 
Optima Belle LLC;
Belle
July 10, 2018   Application 
Kanawha G10-D038I
Roberts 
Panther Creek Mining, LLC;
Dry Branch Prep. Plant
July 2, 2018   Final Permit
Evaluation
Application
Kanawha PD18-017
Rothwell 
 SHENTEL SERVICE LLC DBA SHENTEL;
67155 Cabin Creek
 April 9, 2018   Determination
Evaluation
 Application 
Kanawha  PD18-034
Rothwell 
SHENTEL SERVICE LLC DBA SHENTEL;
67154A Paint Creek 
June 15, 2018   Determination
Evaluation
Application
Kanawha  13-3395
Martin 
Southern West Virginia Asphalt, Inc.;
Ravenswood #61 
January 17, 2018  March 29, 2018   Final Permit
Evaluation
Draft Permit
Fact Sheet
Application
 
 Kanawha 13-3232B
Keys
Tennessee Gas Pipeline Company, LLC; 
Station 118A 
Auguat 27, 2018    Final Permit
Evaluation
Application
Kanawha 13-3233A
Kees 
Tennessee Gas Pipeline Company, LLC; 
Station 119A
June 11, 2018    Final Permit
Evaluation

Application
 Kanawha 13-3233B
Kees 
Tennessee Gas Pipeline Company, LLC; 
Station 119A 
Auguat 27, 2018    Final Permit
Evaluation
Application 
 Kanawha 13-3111E
Pursley 
Union Carbide Corporation;
Institute Plant 
 May 11, 2018   Final Permit
Evaluation
Application
Kanawha 13-3404
Egnor 
Union Carbide Corporation;
Institute Plant
May 11, 2018  September 27, 2018  Final Permit
Evaluation
Draft Permit
Fact Sheet
Application 
 Kanawha  13-3412
Legg
 Union Carbide Corporation;
Institute Plant
July 19, 2018 October 26 2018  Draft Permit
Fact Sheet
Application
 Kanawha  13-3308A
Kessler
 Union Carbide Corporation;
South Charleston
April 25, 2018     Final Permit
Evaluation
Application
 Kanawha 13-2056I
Rothwell 
Walker Machinery Company;
Belle Facility
July 24, 2018   Final Permit
Evaluation
Application 
 Kanawha 13-3362A
Martin 
 WEST VIRGINIA PAVING, INC.;
PLANT 30 (DUNBAR)
 March 8, 2018  June 22, 2018 Final Permit 
Evaluation
Draft Permit
Fact Sheet
Application 

 

Lewis

 Lewis G35-D143
Keatley
HG Energy II Appalachia, LLC;
Hollick Tap Site
August 30, 2018   Application
Lewis PD18-006
Rothwell  
MULTI-CHEM GROUP, LLC;
Jane Lew  
February 13, 2018    Determination
Evaluation
Application 

 

Lincoln

           
           

 

Logan

Logan  G65-D572
Rothwell 
CSX Transportation, Inc.;
Peach Creek Yard
Agust 20, 2018   Final Permit 
Evaluation
Application
Logan G10-D103I
Roberts 
Greenbrier Minerals, LLC; 
Saunders 
May 21, 2018    Final Permit 
Evaluation
Application 
 Logan  13-3421
Roberts
Mingo Logan Coal, LLC;
Cardinal Prep Plant
August 30, 2018   Application
Logan G10-D158A
Roberts
Ramaco Resources, LLC;
Elk Creek Prep Plant
June 6, 2018   Final Permit 
Evaluation
Application


 

Marion

Marion  PD18-007
Andrews  
 American Bituminous Power Partners, L.P.;
Grant Town Plant
February 15, 2018    Determination
Evaluation
  Application 
 
 Marion G70-D353
Keatley 
EQT Production Company;
GRT-26 Wellpad
September 6, 2018   Application
Marion  G60-C099
Rothwell
 Fibrek Recycling U.S. Inc.;
Fairmont
April 20, 2018    Final Permit
Evaluation Application 
 Marion 13-1525D
Williams 
Fibrek Recycling U.S. Inc.;
Fairmont 
 September 26, 2018   Application
Marion 13-3422
Kees 
Mountain Gathering, LLC;
McClelland Station
September 11, 2018   Application
Marion  PD18-036
Andrews 
Novelis Corporation;
Fairmont
July 5, 2018   Determination
Evaluation
Application

 

Marshall

Marshall   G70-D357
Kees
American Petroleum Partners Operating, LLC;
Casterly Rock North Well Pad
October 15, 2018   Application
Marshall G35-D137
Carney
Appalachia Midstream Services, L.L.C.; Ridgeline Station June 1, 2018   Final Permit
Evaluation
Application
Marshall  13-2913B
Williams 
 Appalachia Midstream Services, LLC;
Sand Hill Station 
February 7, 2018   April 17, 2018   Final Permit
Evaluation
Application
 Marshall 13-2913C
Williams
Appalachia Midstream Services, LLC;
Sand Hill Station
September 5, 2018   Application
Marshall  G35-D138
Keatley 
Appalachia Midstream Services, LLC; Wilson CDP June 7, 2018   Final Permit 
Evaluation
Application
 Marshall  13-2896F
Kessler
Blue Racer Natrium, LLC;
Natrium Ex. & Fract.
August 6, 2018   Application
Marshall G70-D342
Keatley 
Chevron Appalachia, LLC;
Hart Pad B 
July 9, 2018   Final Permit 
Evaluation
Application
Marshall PD18-021
Williams
 Chevron Appalachia, LLC;
Siburt 
April 24, 2018    Determination
Evaluation
Application
 Marshall PD18-020
Williams 
 Chevron Appalachia, LLC;
Snyder
 April 24, 2018   Determination
Evaluation
Application
 
 Marshall G70-D305
Carney 
Chevron Appalachia, LLC;
Taylor Site 
December 19, 2017  January 18, 2018  Final Permit
Evaluation
Application 
 Marshall G70-D305B
Williams 
Chevron Appalachia, LLC;
Taylor B Site
June 12, 2018   Final Permit
Evaluation 
Application
 Marshall  G70-D336
Kees
Chevron Appalachia, LLC;
Taylor C Site 
May 30, 2018    Final Permit
Evaluation
Application
Marshall  13-2149D
Kessler 
 Columbia Gas Transmission, LLC;
Adaline
 March 8, 2018 May 18, 2018   Final Permit 
Evaluation
Draft Permit
Fact Sheet
Application
Marshall   13-3081F
Pursley
 CONE Gathering LLC;
Majorsville
April 24, 2018    Final Permit 
Evaluation
Application 
 Marshall  13-0842F
Legg
 Covestro LLC;
New Martinsville
 May 3, 2018   Final Permit
Evaluation
Application
Marshall G35-D142
Carney 
CNX Midstream Operating Company, LLC; 
Dry Ridge Station
August 14, 2018   Application
 Marshall  PD18-026
Rothwell
 Dominion Energy Transmission, Inc.; Burch Ridge Station May 11, 2018    Determination
Evaluation
Application
Marshall  R14-0027F
Andrews 
 Eagle Natrium LLC;
Natrium
October 31, 2017  March 15, 2018  Final Permit 
Evaluation
Draft Permit
Fact Sheet
Application
Marshall 13-3391
Kessler 
ECC Windsor Inc;
18H-1 Bailey 
November 22, 2017  February 15, 2018  Final Permit 
Evaluation
Draft Permit
Fact Sheet
Application 
Marshall  13-3392
Andrews
 ECC Windsor Inc;
19H-1 Bailey
November 27, 2017   March 5, 2018 Draft Permit
Fact Sheet
Application 
 Marshall G70-D355
Kees 
HG Energy II Appalachia, LLC; 
MND - 1
September 28, 2018   Application
Marshall PD18-033
Kees 
HG Energy II Appalachia, LLC;
Sand Hill 27
June 8, 2018   Determination
Evaluation
Application
 Marshall  PD18-035
Kees
 HG Energy II Appalachia, LLC;
Sand Hill 27
June 18, 2018    Determination
Evaluation
Application
 Marshall G70-D343
Keatley 
HG Energy II Appalachia, LLC;
Sand Hill 27 
July 10, 2018    Final Permit 
Evaluation
Application
Marshall   13-2177H
Roberts
 The Marshall County Coal Company;
Marshall Cnty Facility
 November 27, 2017    Final Permit 
Evaluation
Application
 Marshall  13-3405
Kessler
 MCELROY GREEN MARKETING, LLC; Marshall Flare 6 E May 23, 2018   July 3, 2018 Final Permit 
Evaluation
Draft Permit
Fact Sheet
Application
 Marshall 13-2883A
Andrews 
PVS Technologies, Inc.;
Natrium Plant
September 12, 2018   Application
Marshall G70-D322
Williams 
SWN Production Company, LLC;
BW Edge Pad 
April 3, 2018  May 3, 2018  Final Permit
Evaluation
Application
Marshall G70-D094E
Keatley 
 SWN Production Company, LLC;
Van Aston Pad
June 19, 2018   Application
 Marshall 13-3415
Williams 
TH EXPLORATION II, LLC;
Condensate Pad #1
July 25, 2018 October 1, 2018  Final Permit
Evaluation
Draft Permit
Fact Sheet
Application
 Marshall G70-D349
Carney 
TH EXPLORATION II, LLC;
Corley Well Pad
August 3, 2018   Final Permit
Evaluation
Application
 Marshall  G70-D352
Keatley
TH Exploration II, LLC;
Heaven Hill 2 AST
September 5, 2018   Application
Marshall 13-3411
Williams 
Tug Hill Operating, LLC;
Heaven Hill 2 AST
July 2, 2018  September 20, 2018 Final Permit
Evaluation
Draft Permit
Fact Sheet
Application
Marshall  PD18-003
Andrews
Tug Hill Operating, LLC;
Heaven Hills 2 CRP 
 January 22, 2018   Determination
Evaluation
Application
Marshall  PD18-005
Carney 
Tug Hill Operating, LLC;
Shields Well Pad 
January 30, 2018     Determination
Evaluation
Application
Marshall 13-3168C
Carney 
 Williams Ohio Valley Midstream LLC;
Conner Station
April 24, 2018  July 5, 2018  Final Permit 
Evaluation
Draft Permit
Fact Sheet
Application
Marshall   13-3168D
Carney
 Williams Ohio Valley Midstream LLC;
Conner Station 
August 28, 2018    Final Permit
Evaluation
Application
 Marshall PD18-018
Rothwell 
Williams Ohio Valley Midstream LLC;
Ft. Beeler 
April 20, 2018    Determination
Evaluation
Application
 
Marshall  PD18-014
Rothwell 
Williams Ohio Valley Midstream LLC;
Oak Grove 
March 15, 2018     Determination
Evaluation
Application
 
 Marshall  13-3179A
Carney
Williams Ohio Valley Midstream LLC;
Pinecone Station 
August 28, 2018   Final Permit
Evaluation
Application
 Marshall G35-D140
Kees 
XCL Midstream Operating, LLC;
Channing Compressor
July19, 2018   Final Permit
Evaluation
Application
 Marshall  G35-D141
Carney
 XCL Midstream Operating, LLC;
Midcap Station
July 26, 2018   Withdrawn
Application
Marshall  G35-D139
Kees
XCL Midstream Operating, LLC;
Payne Station
June 29, 2018   Final Permit
Evaluation
Application

 

Mason

 Mason PD18-049
Rothwell
The Adjutant General's Department;
Point Pleasant
September 17, 2018   Determination
Evaluation
Application
           

 

McDowell

McDowell  G10-D137A
Roberts
Cornerstone Processing, Inc.;
Switchback Loadout
July 27, 2018   Application
           

 

Mercer

 Mercer G10-D178
Roberts
Cornerstone Processing, LLC;
Crane Creek Prep Plant
October 2, 2018   Application
           

 

Mineral

 Mineral 13-3408
Andrews 
Alliant Techsystems Operations LLC;  Rocket Center June 12, 2018 October 11, 2018  Final Permit
Evaluation
Draft Permit
Fact Sheet
Application
Mineral 13-2707B
Martin
Lumber & Things, Inc.;
Keyser 
April 23, 2018    Application 
           

 

Mingo

Mingo  PD18-009
Rothwell 
Core Appalachia Midstream LLC;
B-410/B-411 Station 
February 21, 2018    Determination
Evaluation
Application 
 Mingo  G10-D089C
Roberts
Southeastern Land, LLC;
Naugatuck
July 30, 2018   Final Permit 
Evaluation
Application
Mingo 13-3398
Roberts 
 SOUTHEASTERN LAND, LLC;
Twin Branch Surface 
February 21, 2018   June 29, 2018 Final Permit
Evaluation
Draft Permit
Fact Sheet
Application 

 

Monongalia

 Monongalia G10-D002C
Roberts 
Coresco, LLC;
Maidsville River Dock 
February 27, 2018  March 29, 2018  Final Permit
Evaluation
Application 
Monongalia  PD18-030
Rothwell
 The Crossings at Morgantown; Point Marion Road May 22, 2018    Determination
Evaluation
Application
Monongalia   G35-D134
Kees
DTE Appalachia Gathering, LLC;
Carrico Station 
January 16, 2018   February 15, 2018 Final Permit
Evaluation
Application 
Monongalia  G35-D124A
Carney 
DTE Appalachia Gathering, LLC;
Hamilton Station
July 16, 2018   Final Permit
Evaluation
Application
 Monongalia G35-D144
Carney 
DTE Appalacia Gathering, LLC;
Mepco Compressor
October 2, 2018   Application
Monongalia  PD18-002
Martin
GREER LIMESTONE COMPANY;
Greer/Quarry Operation  
January 12, 2018    Determination
Evaluation
Application
 Monongalia  PD18-039
Rothwell
Monongahela Power Company;
Fort Martin Station
July 19, 2018   Determination
Evaluation
Application
Monongalia  PD18-038
Rothwell
Morgantown Machine & Hydraulics;
Goshen Road
June 29, 2018   Determination
Evaluation
Application
 Monongalia  13-3426
Legg
Morgantown Utility Board;
Star City WWTP
October 15, 2018   Application
Monongalia G70-D165A
Kees 
Northeast Natural Energy, LLC; Coastal Pad June 5, 2018   Final Permit
Evaluation
Application
 Monongalia G70-D165B
Keatley
Northeast Natural Energy, LLC; Coastal Pad  July 5, 2018    Application
 Monongalia G70-D221A
Carney 
 Northeast Natural Energy LLC;
Fisher Well Pad
May 9, 2018    Final Permit
Evaluation
Application 
Monongalia   G70-D338
Carney
Northeast Natural Energy, LLC;
Jenkins Facility
June 26, 2018   Final Permit 
Evaluation
Application
 Monongalia 14-0007D
Andrews 
Morgantown Energy Associates;
Morgantown
July 23, 2018   Final Permit
Evaluation
Application
Monongalia 13-2068V
Kessler
Mylan Pharmaceuticals, Inc.;
Morgantown
June 5, 2018   Final Permit
Evaluation
Application
Monongalia PD18-031
Rothwell
Swanson Plating Corporation, Inc.;
Morgantown
May 31, 2018   Determination
Application
 Monongalia PD18-037
Rothwell 
 Swanson Plating Corporation, Inc.;
Morgantown
July 5, 2018    Determination
Evaluation
Application
Monongalia  G40-C096
Martin
 Vance River Terminal, Inc.;
Westover Site
 May 30, 2018   Final Permit
Evaluation
Application 
Monongalia   PD18-008
Martin
 Wendell H. Stone Company, Inc.;
Morgantown
February 20, 2018    Determination
Evaluation
Application 

 

Monroe

           
           

 

Morgan

 Morgan PD18-024
Rothwell 
 U.S. SILICA COMPANY;
Berkeley Springs Quarry
 May 10, 2018   Determination
Evaluation
Application 
 Morgan 13-0029A
Legg 
 U.S. SILICA COMPANY;
Berkeley Springs Quarry
July 30, 2018   Application

 

Nicholas

Nicholas  13-2192Q
Pursley
Jeld-Wen, Inc.;
Craigsville
August 1, 2018   Application
Nicholas  13-3402
Kees 
 Nytis Exploration Company LLC;
ORLANDI STATION
April 9, 2018   June 18, 2018 Final Permit
Evaluation
Draft Permit 
Fact Sheet
Application
 
 Nicholas G10-D005F
Roberts 
Power Mountain Contura, LLC;
Power Mountain Prep Plant
June 7, 2018   Application

 

Ohio

 Ohio 13-2916B
Williams 
Appalachia Midstream Services, LLC;
Battle Run 
February 7, 2018  May 14, 2018  Final Permit
Evaluation
Draft Permit 
Fact Sheet
Application
  
Ohio 13-2916C
Williams
Appalachia Midstream Services, LLC;
Battle Run
September 5, 2018   Application
Ohio   G35-D127A
Carney
APPALACHIA MIDSTREAM SERVICES, L.L.C.;
Pioneer Facility 
March 8, 2018   April 9, 2018 Final Permit
Evaluation

Application
 Ohio  13-2578D
Legg
 CFOAM LLC;
Triadelphia
 March 9, 2018   Final Permit
Evaluation

Application
Ohio  G70-D321
Carney 
SWN Production Company, LLC;
Brian Dytko Pad 
March 21, 2018   April 20, 2018 Final Permit
Evaluation

Application
Ohio G70-D333
Keatley
SWN Production Company, LLC; Clarence Farmer Pad May 29, 2018   Application
Ohio G70-D279A
Kees 
SWN Production Company, LLC; Edward Nichols Pad  May 18, 2018    Final Permit
Evaluation
Application 
Ohio   G70-D313
Kees
SWN Production Company, LLC;
Esther Weeks Pad 
 January 29, 2018 February 28, 2018  Final Permit
Evaluation

Application 
 Ohio  G70-D318
Carney
 SWN Production Company, LLC;
Larry Ball Pad
 February 27, 2018 March 29, 2018  Final Permit
Evaluation

Application 
Ohio  G70-D316
Keatley 
SWN Production Company, LLC;
Mark Hickman Pad 
February 22, 2018  March 26, 2018  Final Permit
Evaluation

Application  
Ohio G70-D297A
Carney 
SWN Production Company, LLC;
Melvin Kahle Pad 
March 5, 2018   April 4, 2018  Final Permit
Evaluation

Application
Ohio  13-2995D
Kees 
SWN Production Company, LLC;
Michael Ratcliffe Pad 
January 11, 2018    Final Permit
Evaluation

Application 
Ohio G70-D310
Carney 
SWN Production Company, LLC;
OCC A Pad 
January 17, 2018   February  16, 2018 Final Permit
Evaluation

Application 
 Ohio G70-D341
Carney 
SWN Production Company, LLC;
Rayle Coal Pad 
July 5, 2018    Final Permit
Evaluation
Application
 Ohio G70-D070B
Carney 
SWN Production Company, LLC;
Roy Ferrell Pad
July 16, 2018   Final Permit
Evaluation
Application
Ohio  G70-D314
Keatley
 SWN Production Company, LLC;
Roy Riggle Pad
 February 5, 2018 March 7, 2018   Final Permit
Evaluation

Application
Ohio   G70-D351
Keatley
SWN Production Company, LLC;
Timmy Minch Pad 
August 27, 2018   Application
Ohio   13-2562D
Legg
Tekni-Plex, Inc. dba Tri-Seal Products;
Triadelphia  
September 18, 2017   May 23, 2018 Final Permit 
Evaluation Draft Permit 
Fact Sheet
Application Resubmittal 
Application
 

 

Pendleton

Pendleton 13-1396D
Kessler
Greer Lime Company;
Riverton
June 19, 2018 October 9, 2018  Final Permit 
Evaluation
Draft Permit
Fact Sheet
Application
 Pendleton PD18-050  T & F Exploration, LP;
Hedrick Station
September 24, 2018   Application

 

Pleasants

Pleasants  13-2473M
Legg 
 Allnex USA Inc.;
Willow Island
May 10, 2018    Final Permit 
Evaluation
Application 
Pleasants  13-2156AD
Legg 
Cytec Industries, Inc.;
Willow Island 
 August 17, 2018   Final Permit
Evaluation
Application
Pleasants 13-2156AC
Kessler
Cytec Industries, Inc.;
Willow Island
June 4, 2018 October 5, 2018  Final Permit 
Evaluation
Draft Permit
Fact Sheet
Application
Pleasants  13-2156AB
Kessler
 Cytec Industries, Inc.;
Willow Island
April 30, 2018  July 4, 2018  Final Permit 
Evaluation
Draft Permit
Fact Sheet
Application 
 Pleasants  13-2156AA
Kessler
 Cytec Industries, Inc.;
Willow Island
 February 15, 2018   Final Permit 
Evaluation
Application 

 

Pocahontas

Pocahontas  G40-C051C
Martin
Appalachian Aggregates, LLC;
Mill Point Plant
August 17, 2018   Final Permit 
Evaluation
Application
           

 

Preston

 Preston  13-2658B
Andrews
The Adjutant General's Department;
Camp Dawson 
January 30, 2018  April 12, 2018  Final Permit
Evaluation
Draft Permit
Fact Sheet
Application 
 Preston PD18-051
Rothwell 
Appalachian Wood Pellets, Inc.;
Kingwood
October 11, 2018   Application

 

Putnam

Putnam 13-2407A
Kessler 
 AC&S, Inc.;
Nitro
February 14, 2018   June 25, 2018 Final Permit
Evaluation
Draft Permit
Fact Sheet
Application 
 Putnam  13-2574B
Andrews
 The Adjutant General's Department;
Eleanor Maint. Fac.
 January 29, 2018   Application 
Putnam G60-C005D
Rothwell  
Toyota Motor Manufacturing, WV;
Buffalo  
 April 12, 2018  May 14, 2018   Final Permit
Evaluation
Application 
 Putnam  G60-D005E
Rothwell
 Toyota Motor Manufacturing, WV;
Buffalo 
 August 31, 2018   Final Permit 
Evaluation
Application

 

Raleigh

 Raleigh  13-3409T
Martin
Appalachian Aggregates, LLC; Beckley Plant June 15, 2018   Final Permit
Evaluation
Application
Raleigh G10-D156A
Roberts 
 GOAL'S COAL COMPANY;
SUNDIAL #10 (Naoma)
March 8, 2018  April 9, 2018   Final Permit
Evaluation
Application
Raleigh  G10-D173A
Martin
Republic Energy, LLC; 
Workman Creek 
March 20, 2018  April 19, 2018  Final Permit
Evaluation
Application 
 Raleigh G40-C093
Martin 
 Republic Energy, LLC; 
Workman Creek
 March 20, 2018  April 19, 2018 Final Permit
Evaluation
Application 
 Raleigh 13-3302A
Pursley 
Seven Islands Environmental Solutions, LLC;
New River Facility
July31, 2018   Final Permit
Evaluation
Application
 Raleigh  PD18-040
Rothwell
VA Medical Center Beckley;
Beckley
July 30, 2018   Determinaton
Evaluation
Application

 

Randolph

Randolph 13-1692C
Legg 
Colonial Millwork, Ltd.;
Beverly
September 10, 2018   Application
Randolph  G65-C569
Rothwell
Elkins, City of;
Water Treatment Plant 
November 2, 2017   December 4, 2017 Final Permit
Evaluation
Application 
 Randolph 13-3369A 
Kessler 
 Energy Corporation of America;
Mabie
 April 9, 2018 June 29, 2018  Final Permit
Evaluation
Draft Permit
Fact Sheet
Application 
Randolph  G40-C099
Martin 
Leslie Equipment Co.;
Norton
September 12, 2018   Application
Randolph G65-C571
Rothwell  
U.S. General Services Administration;
Forest Service Bldg  
 March 23, 2018 April 23, 2018   Final Permit
Evaluation
Application 

 

Ritchie

Ritchie  G70-D312
Keatley
 Antero Resources Corporation;
Hichman Well Pad
 January 29, 2018 February 28, 2018  Final Permit
Evaluation
Application 
 Ritchie G70-D348
Kees 
Antero Resources Corporation;
Lettie Well Pad 
August 2 2018   Final Permit 
Evaluation
Application
Ritchie G70-D062A
Kees 
 Antero Resources Corporation;
Lockhart Heirs Pad
January 12, 2018  February 12, 2018  Final Permit
Evaluation
Application 
 Ritchie  G70-D347  Antero Resources Corporation;
Meredith Well Pad
August 2, 2018   Application 
Ritchie  G70-D317
Keatley
 Antero Resources Corporation;
Poll Well Pad
 February 26, 2018 March 29, 2018   Final Permit
Evaluation
Application
Ritchie G70-D334
Carney
Antero Resources Corporation; Weekley Trust Pad May 30, 2018 Final Permit
Evaluation
Application
   G70-D309
Kees
Antero Resources Corporation;
Yolanda Well Pad 
 January 12, 2018  February 12, 2018 Final Permit
Evaluation
Application 

 

Roane

           
           

 

Summers

           
           

 

Taylor

           
           

 

Tucker

 Tucker PD18-019
Kessler 
 Kingsford Manufacturing Company;
Parsons
April 20, 2018    Application 
 Tucker 13-1608I
Kessler 
Kingsford Manufacturing Company;
Parsons 
June 15, 2018    Withdrawn
Application

 

Tyler

 Tyler  13-3373A
Williams
Antero Midstream LLC;
East Mountain 
 December 20, 2017   March 9, 2018 Final Permit
Evaluation
Draft Permit
Fact Sheet
 Application 
 Tyler 13-3380
Williams
Antero Midstream LLC;
Middlebourne IV 
 September 18, 2017 December 22, 2017  Final Permit
Evaluation
Draft Permit
Fact Sheet
 Application
Tyler  13-3380A
Williams
Antero Midstream LLC;
Middlebourne IV 
October 11, 2018    Application
 Tyler  13-3394
Williams
Antero Midstream LLC;
Middlebourne V 
 December 20, 2017  March 23, 2018  Final Permit
Evaluation
  Draft Permit
Fact Sheet
 Application
 Tyler G70-D350
Kees 
Antero Resources Corporation;
Ferrell Well Pad
August 23, 2018   Application
Tyler G70-D101B
Carney 
 Antero Resources Corporation;
Kirk Hadley Pad
January 19, 2018  February 20, 2018  Final Permit
Evaluation
Application
Tyler   G70-D101C
Williams
Antero Resources Corporation;
Kirk Hadley Pad 
May 30, 2018    Final Permit
Evaluation
Application  
Tyler  G70-D311
Carney
 Antero Resources Corporation;
Neal Well Pad
January 29, 2018  February 28, 2018  Final Permit
Evaluation
Application
Tyler G70-D320
Keatley 
 Antero Resources Corporation;
Pyle Run Pad 
 March 9, 2018  April 9, 2018 Final Permit
Evaluation
Application
Tyler  G70-D345
Carney 
Antero Resources Corporation;
Reel Well Pad
July 16, 2018   Final Permit
Evaluation
Application
Tyler   G70-D301
Kees
Antero Resources Corporation;
Rush Fork Pad
November 20, 2017   December 20, 2017  Final Permit
Evaluation
Application
Tyler G70-D335
Carney
Antero Resources Corporation;
Sine Well Pad
May 30, 2018    Final Permit
Evaluation
Application
Tyler   G70-D315
Carney
 Antero Resources Corporation;
 Stonefly Well Pad
 February 20, 2018  March 22, 2018  Final Permit
Evaluation
Application 
 Tyler G70-D073C
Kees 
 Antero Resources Corporation;
Weigle East Well Pad
July 11, 2018   Final Permit
Evaluation
Application
 Tyler 13-3423
Pursley 
Brown Beaver Land Company, LLC;
Bens Run Energy Ctr 
September 5, 2018   Application
Tyler 13-3207B
Andrews 
Cone Gathering LLC;
Shirley Station
August 4, 2018 September 28, 2018 Final Permit
Evaluation
Draft Permit
Fact Sheet
Application
Tyler G70-D332
Carney 
 CNX Gas Company, LLC;
Shirley 31
May 17, 2018     Final Permit
Evaluation

Application 
 Tyler 13-3309A
Kees 
Jay-Bee Oil & Gas, Inc.;
Doc Well Pad
July 9, 2018  September 7, 2018 Final Permit 
Evaluation
Draft Permit
Fact Sheet
Application
Tyler G70-D138B
Kees 
Jay-Bee Oil & Gas, Inc.;
Grumpy Well Pad 
July 2, 2018   Application
 Tyler G70-D339
Carney 
Jay-Bee Oil & Gas, Inc.; 
P4 Facility
June 28, 2018    Final Permit
Evaluation
Application
Tyler   G70-D340
Kees
Jay-Bee Oil & Gas, Inc.; 
P5 Facility
June 29, 2018    Final Permit
Evaluation
Application 
Tyler 13-3364B
Kees 
Jay-Bee Oil & Gas, Inc.;
Pleasants Station
June 7, 2018   Application
 Tyler  13-2338L
Egnor
MPM Silicones, LLC;
Friendly
March 30, 2018    Final Permit
Evaluation
Application
 Tyler 13-2338K
Egnor 
MPM Silicones, LLC;
Friendly
 December 27, 2017    Final Permit
Evaluation
 Application 
Tyler  13-2338J
 Legg
MPM Silicones, LLC;
Friendly 
November 3, 2017     Final Permit
Evaluation
Revised
Application
Application 
Tyler   13-3035C
Keatley
 Triad Hunter, LLC;
Spencer Station
March 15, 2018   August 31, 2018 Final Permit
Evaluation
Draft Permit
Fact Sheet
Application 

 

Upshur

Upshur  G35-D030D
Carney 
 CONE Gathering LLC;
Alton Station
 March 28, 2018 April 27, 2018  Final Permit
Evaluation
Application 
           

 

Wayne

 Wayne 13-2545I
Andrews 
Allevard Sogefi U.S.A., Inc;
Prichard
June 21, 2018 October 31, 2018  Draft Permit
Fact Sheet
Application
Wayne  13-1830N
Egnor
Braskem America, Inc.;
Kenova 
November 6, 2017    Final Permit
Evaluation
Application 
Wayne  G10-D177
Roberts 
 CCI Cyrus River Terminal LLC;
Sandy River Dock
April 13, 2018    Final Permit
Evaluation
Application  
Wayne  13-3413
Kees 
Cranberry Pipeline Corporation;
Pigeon Roost Station
July 19, 2018 October 29, 2018  Draft Permit
Fact Sheet
Application

 

Webster

           
           

 

Wetzel

 Wetzel G70-D346
Keatley 
Antero Resources Corporation;
Gadd Well Pad
July 16, 2018   Application
Wetzel G35-D128A
Carney 
 APPALACHIA MIDSTREAM SERVICES, L.L.C.;
Blake Ridge Facility
 March 8, 2018 April 9, 2018  Final Permit
Evaluation
Application 
 Wetzel 13-3336A
Kees 
Blue Racer Midstream, LLC;
Field Station 1 
 December 27, 2017   Final Permit
Evaluation
Application 
 Wetzel 13-3382
Carney 
 CNX Gas Company LLC;
Windy Ridge Station
 October 6, 2017 March 16, 2018   Final Permit
Evaluation
Draft Permit
Fact Sheet
 Application 
Wetzel  G70-D330
Keatley 
 EQT Production Company;
BIG-464
 May 10, 2018   Final Permit
Evaluation
Application
Wetzel  G70-D326
Keatley
EQT Production Company;
NMA 8 Wellpad 
April 30, 2018    Application
Wetzel G70-D066A
Keatley 
 EQT Production Company;
NMA 10 Wellpad 
April 30, 2018     Application
Wetzel  G70-D325
Keatley
EQT Production Company;
NMA-11 Wellpad  
April 30, 2018    Application 
Wetzel   G70-D323
Carney
EQT Production Company;
NMA-12 Wellpad  
April 19, 2018   Application 
Wetzel  G70-D329
Kees 
 EQT Production Company; 
PFS26 Well Pad
 May 10, 2018    Final Permit
Evaluation 
Application
Wetzel G70-D328
Carney
EQT Production Company;
PNG-241 Well Pad
May 10, 2018   Final Permit
Evaluation
Application
Wetzel G70-D327
Keatley
EQT Production Company;
PNG 244 Well Pad 
May 10, 2018   Application 
Wetzel   13-3371A
Kessler 
 Equitrans, L.P.;
Logansport
 February 15, 2018     Final Permit
Evaluation
Application 
Wetzel  G60-D101
Rothwell
Equitrans, L.P.;
Logansport
September 4, 2018   Application 
Wetzel  13-3007F
Keatley
Eureka Midstream, LLC;
Carbide Site
August 2, 2018   Final Permit 
Evaluation
Application
Wetzel  G35-D131A
Carney
Hornet Midstream Pipeline, LLC;
North Facility
August 3, 2018   Application
Wetzel  13-2878G
Legg
MarkWest Liberty Midstream & Resources, LLC;
Mobley Gas Plant
August 28, 2018   Final Permit
Evaluation
Application
Wetzel  G70-D331
Kees
SWN Production Company, LLC;
Floyd Johnson 
May 14, 2018    Final Permit
Evaluation
Application 
 Wetzel G70-D324
Kees 
 SWN Production Company, LLC;
Rine Pad
 April 25, 2018   Final Permit
Evaluation
Application
 Wetzel  13-3084A
Keatley
 William Ohio Valley Midstream LLC;
Nice Station
May18, 2018    Application 
 Wetzel 13-3151B
Kees
 Williams Ohio Valley Midstream LLC;
Stillwagoner Comp. Station  
April 24, 2018    Final Permit
Evaluation Application 
Wetzel 13-3407
Williams 
XCL Midstream Operating, LLC; Channing AST Site June 4, 2018   Final Permit
Evaluation
Application
 Wetzel  13-3410
Carney
XCL Midstream Operating, LLC; 
Wells Hill Station 
June 29, 2018  October 29, 2018 Draft Permit
Fact Sheet
Application

 

Wirt

           
           

 

Wood

Wood  13-0280D
Roberts 
 Camden Materials;
Parkersburg
 March 28, 2017  March 29, 2018 Final Permit
Evaluation 
Draft Permit
Fact Sheet
Application  
Wood  PD18-022
Egnor 
 The Chemours Company FC, LLC;
Washington Works 
April 27, 2018    Determination
Evaluation
Application 
Wood 13-1953K
Andrews 
 The Chemours Company FC, LLC;
Washington Works
June 4, 2018    Final Permit
Evaluation
Application
Wood   13-3416
Andrews
The Chemours Company FC, LLC;
Washington Works 
July 27, 2018    Application 
Wood  PD18-042
Rothwell 
 The Chemours Company FC, LLC;
Washington Works 
August 3, 2018    Determinaton
Evaluation
Application
Wood  G60-C098
Rothwell
 Claywood Park Public Service District; Claywood Park March 20, 2018 April 19, 2018  Final Permit
Evaluation
Application 
Wood  PD18-029
Rothwell
E. I. du Pont de Nemours and Company;
Washington Works  
May 18, 2018    Determination
Evaluation
Application
Wood  13-1686H
Legg
E. I. du Pont de Nemours and Company;
Washington Works  
 May 18, 2018   Final Permit
Evaluation
Application 
Wood  13-1533M
Legg
E. I. du Pont de Nemours and Company;
Washington Works 
June 18, 2018    Final Permit
Evaluation
Application
Wood 13-1145F
Egnor 
E. I. du Pont de Nemours and Company;
Washington Works 
 July2, 2018   Final Permit
Evaluation
Application
Wood  13-1596F
Legg 
E. I. du Pont de Nemours and Company;
Washington Works 
July 10, 2018    Final Permit
Evaluation
Application
Wood  13-1145G
Egnor 
E. I. du Pont de Nemours and Company;
Washington Works  
September 13, 2018    Application
Wood 13-3399
Egnor 
 Hino Motors Manufacturing USA, Inc.;
Hin WV South
March 12, 2018   June 8, 2018  Final Permit
Evaluation
Draft Permit
Fact Sheet
Application 
 Wood PD18-045
Rothwell 
Hino Motors Manufacturing USA, Inc;
Williamstown
August 27, 2018   Determination
Evaluation
Application
Wood   PD18-043
Rothwell
WV Army National Guard;
Wood Co Armory
August 17, 2018   Determination
Evaluation
Application

 

Wyoming

 Wyoming  G40-C092
Martin
 Ken & Coy Rock Co., Inc.;
Pineville
 October 4, 2017 November 3, 2017  Final Permit
Evaluation
Draft Permit
Fact Sheet
Application 
Wyoming 13-2104I
Roberts
Kepler Processing Company, LLC;
Pineville/Pocahontas
June 7, 2018   Application
Wyoming  13-2104H
Roberts
Kepler Processing Company, LLC;
Pineville/Pocahontas 
May 24, 2018     Withdrawal
Application
Wyoming 13-3406
Roberts 
 Kepler Processing Company, LLC; Pineville/ Pocahontas  May 24, 2018   Withdrawal
Application 
Wyoming  13-2637B
Roberts
 Road Fork Development;
Pineville
 May 24, 2018   Withdrawal
Application 

 

PORTABLE

   G40-C095
Martin
All Construction, Inc.;
Screening Plant 
May 10, 2018    Final Permit
Evaluation
Application 
  13-3424
Martin 
Bizzack Construction, LLC;
Job 313106
October 4, 2018   Application
    G40-C072C
Martin
Bizzack Construction, LLC;
Metso LT120 #41.6002 
June 21, 2018    Final Permit
Evaluation
Application
   G40-C072B
Martin
Bizzack Construction, LLC;
Metso LT120 #41.6002 
April 20, 2018    Final Permit
Evaluation
Application 
   G40-C097
Martin 
Collins Building & Contracting, Inc.; Collins Locations  June 1, 2018    Final Permit
Evaluation
Application
   G40-C094
Martin
Collins Building & Contracting, Inc.;
Precision Pipeline 
April 25, 2018     Final Permit
Evaluation
Application
   G40-C094A
Martin
Collins Building & Contracting, Inc.;
Precision Pipeline 
July 9, 2018    Withdrawal
Application
  G40-C077B
Martin 
Doss Enterprises;
Portable Crusher
June 8, 2018   Final Permit
Evaluation
Application
  G40-C077C
Martin  
Doss Enterprises;
Portable Crusher 
August 8, 2018    Final Permit 
Evaluation
Application
  G50-B109A
 Martin 
 Golden Triangle Construction Co., Inc.;
Reedsville 
 February 7, 2018 March 9, 2018  Final Permit
Evaluation
Application 
  13-3400T
Martin 
Kokosing Construction Company, Inc.; Corridor H Project    March 19, 2018    Final Permit
Evaluation
Application 
   G40-C098
Roberts
Lexington Coal Company, LLC;
Rock Crusher and Screening Plant
August 2, 2018   Final Permit
Evaluation
Application
  13-3396
Roberts 
 Pocahontas Coal Company LLC;
Stonecoal Creek
 January 25, 2018 June 29, 2018  Final Permit
Evaluation
Draft Permit
Fact Sheet
Application 
  G50-B073-P4
Martin 
 R.G. Johnson Company, Inc.;
8 South #2 Airshaft 
December 27, 2017    Final Permit
Evaluation
Application 

 

STATEWIDE

           
           