§319 final inspection

Final inspections must be completed for each project in which BMPs are implemented. The site visit is scheduled with the regional Basin Coordinator, NPS coordinator or a designee. The simple final inspection form (FIF) is completed on-site and emailed to the NPS Coordinator. Note: Photos showing as-built conditions should also be included. Review the example below to learn more.
 
The inspection should occur prior to completing the final report. The IFI can be submitted seperately or with the final report. To download your choice of Word or PDF file, click the icons below.  
FIF - PDF   FIF - Word