Emission Trading Program Registry

 

 

Source ID 

Series Number

Company Name 

City 

County 

Attainment Status 

Strategy 

Pollutant 

Non-Ozone Season 

Ozone Season 

Exp. Year 

Period Start 

Period End 

  Source    Description 

   Activity Summary     

 051-00009 05100009 2007 N 01  Bayer MaterialScience, LLC ; New Martinsville Plant  New Martinsville  Marshall  Attainment  Shutdown  NOx  3.07  2.87  10/5/2017  1/1/2005  12/31/2006  Reformer Unit was permanently shut down on 10/5/2007  These NOx emission reductions were generated by Bayer as a result of permanently shutting down reformer units at the New Martinsville Plant.  The reformer units were permanently shut down October 5, 2007, and shall be dismantled shortly.  Baseline emission levels were established from 2005 to 2006.  Baseline emissions were calculated by multiplying the fuel usage (combines total of FG1 and FG2 by AP-42 emission factor for NOx, the resulting number was decreased by 60% to account for the bias.  ERCs were reduced by 10% according to 45CSR28.  Bayer voided construction permit R13-2649 for the reformer units. 
 073-00003 07300003 2005 S 01  Cytec Industries, Inc.  Willow Island  Pleasants  Attainment  Replacement  SO2  1,621.35  N/A  12/31/2014  1/1/2003  12/31/2004  Replaced 2 coal-fired and 1 gas-fired boiler with 2 new gas-fired or fuel oil-fired boilers which resulted in ERC credit generation.  The SO2 emission reductions were generated by Cytec as a result of replacing 2 coal-fired and 1 gas-fired boilers with 2 new gas/fuel oil-fired boilers which resulted in ERC credit generation at the Willow Island Plant.  Two old coal-fired boilers were permanently removed on September 1, 2005, and one old gas-fired boiler was permanently removed on November 1, 2005.  Baseline emission levels were established from 2003 to 2004.  Baseline emissions were calculated by multiplying stack test derived emission factors for SO2 emissions by coal usage and subtracting the estimated SO2 emissions from new gas/fuel oil-fired boilers.  SO2 emissions for new boilers were estimated by using AP-42 factor, the resulting number was increased by 50% to account for the bias.  ERCs were reduced by 10% according to 45CSR28.  Cytec obtained permit R13-2560C to install the 2 new gas/fuel oil-fired boilers to replace the old boilers.  The old boilers were shut down in September and November 2005.  The old boilers have been permanently removed from service and will be dismantled in the future. 

 

 

 

Contact Info:

 

Source ID  Sereis Number  Company Name                    Contact 

Phone    

Address                    

051-00009  05100009 2007 N 01  Bayer MaterialScience, LLC ; New Martinsville Plant  Mary Ann Henderson, Manager Regulatory Affairs 

304-451-2431

State Route  2 North New Martinsville, WV  26155-0500

073-00003  07300003 2005 S 01  Cytec Industries, Inc. ; Willow Island Plant  Robert W. Porter, Site Manager  304-665-2422 

#1  Heilman Avenue  Willow Island, WV  26134 

003-00008  00300008 2002 N 01 A  Virginia Electric & Power Company  Robert Bisha, Director- Environmental Business Support 

804-273-3010

5000 Dominion Blvd. Glen Allen, VA  23060
003-00008  00300008 2002 N 01 B  CPV Warren, LLC  Chris Ganley, Project Manager 

240-723-2337

8403 Colesville Road  Suite 915           Silver Springs, MD  20910

 

 

 

Transfer/ Trade:

 

Source ID

Series Number  Transferor/ Seller  Transferee/ Buyer 

Date of Transfer 

Transfer Amount

003-00008

00300008 2002 N 01 A  CPV Warren, LLC  Virginia Electric & Power Co. 

5/22/2008

175 Tons of NOx

003-00008

00300008 2002 N 01  World Kitchen, Inc.  CPV Warren, LLC  3/27/2008 251.1 Tons of NOx




Expired:

 

Source ID

Series Number Owner

Date of Expiration

Expired Amount

003-00008

00300008 2002 N 01 B CPV Warren, LLC

1/1/2012

76.1 Tons of NOx

 

Retirement:

 

Source ID

Series Number  Company Name

Date of Retirement 

Retirement 
Amount

003-00008

00300008 2002 N 01 A  Virginia Electric & Power Co. 

4/8/2011

175 Tons of NOx

023-00014  02300014 2012 N 01*  Virginia Electric and Power Company (VEPCO)  9/1/2012  1267 tons of NOx 
023-00014  02300014 2012 S 01*  Virginia Electric and Power Company  9/1/2012 913 tons of SO2 
*These NOx and SO2  emission reductions were generated by VEPCO through permanent shutdown of their power plant at Bayard.  NOx and SO2 were emitted primarily from two coal refuse fired boilers which were shut down.  Baseline emissions were obtained by CEMs.  ERC's were reduced by 10% per 45CSR28-11.1.a.  Since the reductions were due to a shutdown, all of the emissions included in the baseline emissions levels were assumed to be reduced.  All the associated permits are null and void.


For further information regarding the Emission Trading Program Registry, please contact Bobbie Scroggie at 304-926-0499 extension 1225. 

Privacy, Security and Accessibility | WV.gov | USA.gov | © 2018 State of West Virginia