The State of West Virginia, Department of Environmental Protection, Division of Water and Waste Management is proposing to reissue the West Virginia National Pollutant Discharge Elimination System (NPDES) General Water Pollution Control Permit for Stormwater Associated with Construction Activities. The General Permit will authorize discharges to surface waters of the state for land disturbance operations during development of residential, commercial, or industrial sites. It is proposed that this General Permit be issued for a five (5) year term.
A virtual public hearing has been scheduled to take official comments on the Draft General Permit. The hearing has been scheduled from 6 to 8 p.m. on Monday, January 29, 2024. Pre-registration is required by 5 p.m. the day of the hearing. Registrants will
receive a separate email with the link and call-in number for the virtual hearing once the registration deadline passes.
Date/Time
Starts: 01/29/2024 6:00 PM
Ends: 01/29/2024 8:00 PM
Location
Virtual Hearing
Contact Information
Terry Fletcher
304-926-0499 ext. 49720
Terry.A.Fletcher@wv.gov
Links
Registration link
Draft permit and fact sheet
Submit written comments